Equipment

We provide a range of equipment which complement strand anchor works.

  • Stressing Jack

    Single strand stressing jack: Available in capacity of 250 and 300 kN

    Multi strand stressing jack: Available in capacity of 1600 to 13,800 kN

  • Hydraulic Pump: Power capacity from 1.5 to 22 kW
  • Grouting & Injection Pump
  • Hydraulic Manifold – Decoiler
  • Static Strand Decoiler

    Load Monitoring System

    ForceTec in collaboration with their European partner offers load monitoring solutions and services for geotechnical projects. We offer monitoring solutions using load cells that can continuously monitor the load in the tendons for any eventual load change. Load cells are made of stainless steel, so no cap or cover is required and can be left exposed under the anchor head.

    Data Acquisition using GPRS Transfer

    Incoming data from the sensors will be transmitted to a server through a GPRS modem. Data received by the server can be accessed using a user ID and password for processing. Access to the system can be done using a normal internet browser which doesn’t entail any special installation.

    Following functions are possible

    • Reading of required variables
    • Measure graph
    • Export data in various formats
    • Alarm management
    • Program alarm events

    Applications

    • Monitoring landslide
    • Monitoring geotechnical projects and civil engineering structures
    • Tunnels, dams, bridges and viaducts
    • Alarm management exceeding certain thresholds
    • Remote display for silos and containers

    Characteristics

    • No software required
    • Compatible with most of the geotechnical instrumentation available in the market
    • Possibility of power with photovoltaic panel
    • Alarm transmission via SMS and email